Critical power. Planned for continuity.

Explore power infrastructure requirements for server rooms, data centres and related facilities.

Electrical power distribution infrastructure

Technical scope & capabilities

Sub-stations and generators

Uninterruptible power supply (UPS)

Automatic voltage regulation (AVR)

PDU, PCD and BBT systems

Electrical installation coordination

Power redundancy considerations

Planning critical electrical systems

Power system specification should begin with the electrical load, continuity needs and the facility distribution arrangement. The company profile identifies substations, generators, UPS, AVR, PCD, BBT and PDU equipment.

Required capacity

Share approximate connected load, existing electrical drawings and any known continuity or backup power requirements.

Distribution and backup

Review generator, UPS, voltage regulation, busbar and distribution requirements as a coordinated electrical system.

Next step

Send the project location and electrical scope to discuss suitable system options, availability and implementation coordination.

Discuss your next infrastructure project